Steel frame being erected, one of three being fitted out for start up units. Foundations, steel frame, site car parks and drainage designed.
Site strip and piling mat being placed for local 17 plot development. We were involved with foundation designs, superstructural appraisals and foul and storm drainage to serve the development
Existing roof timbers maintained and strengthened via steel flitch plates and additional purlins.
Structural survey and design assessment on existing steel framed structure with a view to increase crane operating safe working load.